Fox Hollow
Company
RiverBend Materials
Project Type
Aggregates
Location
Eugene, OR
Project was designed to install a “lighter Material” to keep hillside from continuing to slide down the hill
Remove Sunken Roadway, Excavate Slide area to approx.. 16 feet depth, Install geogrid for rock base.
Install Geofoam blocks, Backfill with agg base, Pave roadway, new stripping.
The rock was great and the job went great. We got done sooner then scheduled. Overall it went great.
Brad Reynoso, Owner
Willamette Valley Excavation
Related Projects
Amazon Corporation
Paving operations for a new distribution warehouse that was constructed for Amazon in Salem, OR. The paving area was just over 1 million square feet (23.1 acres). The paving operations included a variety of applications, which included semi-trailer parking areas, access roadways and large parking areas. The weather was unseasonably warmer than normal, which allowed us to place over 9000 tons in the month of January. The remainder, 17800 tons, was placed during March to May.
West Albany High School
Approximately 107,000 sf addition to the existing school that is expected to cost...
Forest Ridge
Project Description (3-5 sentences): This is a new 33 lot subdivision...