Our Projects

We love sharing the process of our work with customers and are passionate about seeing our projects to completion. To us, there's nothing more satisfying than starting with a blank canvas, shaping the earth and creating a completed vision that leaves our customers completely satisfied.

product thumbnail

Hayward Field Renovation

After bringing down the historic University of Oregon Hayward Field complex. The new world class Hayward Field Track and Field facility took it’s place just in time for the 2021 Summer Trials.

Learn More
product thumbnail

South Willamette Street Enhancements

South Willamette Street project started summer of 2020 with utility relocations and ground work. Beginning February of 2021, the bulk of the road work has begun. We have 4000 + CY of concrete paving yet to come as well as pedestrian improvements (walks and ADA ramps). This project is a very high priority for City of Eugene and will be completed by Fall 2021

Learn More
product thumbnail

Prairie Road Paving

Remove old roadway surface and replace it with new. New ADA Ramps and Storm drainage. New stripping.

Learn More
product thumbnail

CDG Broadway Eugene Student Housing

We started this 12 Story High Rise Student Housing with JHC and Baker in early February 2021. We have placed nearly 8000 CY’s in mass concrete and are starting on the vertical concrete. This project will have 12 stories of post tension concrete decks/slabs and will likely be complete by fall of 2022.

Learn More
product thumbnail

McNary Field

New striping and runway grooving

Learn More
product thumbnail

Stanton Furniture Warehouse

This is a new warehouse for Stanton Furniture in the industrial area of Canby, Oregon. It will be 174,000 square feet in size and work as a manufacturing and distribution center.

Learn More
product thumbnail

Oak Hill Drama Center

Site work for New Drama Center for the school. Excavate for foundations, building, outdoor seating area, site concrete, landscaping

Learn More
product thumbnail

Marquis Memory Center

Retirement Community with Assisted Living & Memory Care Facility, Community Center and Apts. 

Learn More
product thumbnail

Highway 58

6 miles of new highway. Removed 3″ old and replace with 3″ of new asphalt
26,000 tons of asphalt
New ADA Ramps and sidewalk in Pleasant Hill
New striping, shoulder rock, guardrail & signage

Learn More
product thumbnail

Greystar Eugene West University Student Housing

We are pleased to be partnering with Marion Construction for this high-rise student housing building on the University of Oregon Campus. Construction started early this year and we began pouring the almost 6,000 CY of mat foundations in early February.
Valley wide, we’ve come together in a huge way to prepare for these large volume pours. We could not do any of this without our excellent team of drivers, our QC group, our Field Service Reps, and last but CERTAINLY not least: our miracle workers in concrete dispatch!
We just finished our last mat slab pour on 03-06-21 and now we’re going vertical!! 12 levels of post tensioned concrete, first pour scheduled for mid March. Construction is scheduled to be complete mid 2022.

Learn More
product thumbnail

Fox Hollow

Project was designed to install a “lighter Material” to keep hillside from continuing to slide down the hill
Remove Sunken Roadway, Excavate Slide area to approx.. 16 feet depth, Install geogrid for rock base.
Install Geofoam blocks, Backfill with agg base, Pave roadway, new stripping.

Learn More
product thumbnail

Eugene Riverfront Infrastructure

City of Eugene now owns 16 Acres of riverfront property that until now was home to EWEB for many years. Riverfront Park will cover a 3 acre section of the property. The new park will include new bicycle and pedestrian paths, seating and river overlooks, as well as a wide variety of art work and decorative concrete features. The larger plan for the Riverfront neighborhood includes a 1- acre park plaza that will house retail space, food cart access and active public space. It also includes a parcel that has been designated for an affordable housing development that will hold no fewer than 75 housing units.
The Riverfront Park Project started in early June and is expected to be completed by late 2021.The Riverfront Infrastructure project which is making way for the additional downtown riverfront neighborhood has also gotten off to a good start. We can expect to see a lot of concrete paving and sidewalk/curb/ADA construction taking place throughout late winter and early spring of 2021.

Learn More

View All